EXAMPLES OF CLEANING CONDUCTED


Line
Pipe

Length
Material Type of Deposit
Deposit strength on pipe wall
Device Drive
Working pressure
Project 1
Return water line power plant
400 mm
800 m
Steel
Lime
up to 100 mm
water
8 bar
Project 2
Drift water
500 mm
4.500 m
Steel
Deposits from flow mediums (extremely hard)
up to 150 mm
water 7 bar
Project 3
Waste water line sewage plant
300 mm
11.000 m
GGG
Deposits from flow mediums up to 80 mm
water 12 bar
Project 4
Raw water line
400 mm
6.300 m
GGG
Iron-manganese
up to 200 mm
water6 bar
Project 5
Colling coil
82,5 mm
190 m
Steel
Deposits from raw water (hard)
up to 12 mm
water 4 bar
Project 6
Newly laid line for dye addition
80 mm
6.270 m
Steel
Foreign objects, rust, scale, welding beads
in mm range
compressed air
8 bar
Project 7
Building material line
50 mm
2.200 m
Steel
Hardened building materials
up to 7 mm
water43 bar
Project 8
Waste water pressure line100 mm
3.600 m
PE-HD
Dump-seepage-water deposit
up to 60 mm
water6 bar
Project 9
Waste water pressure line200 mm
2.500 m
PE-HDSilage and typical deposits
up to 30 mm
water4 bar
Project 10Waste water line
82,5 mm
600 m
Steel rubber coated
REA waste water
up to 20 mm
water6 bar
 